|  | 
| Before alignment | 
|  | 
| Left alignment adjusting hardware | 
|  | 
| Right alignment adjusting hardware | 
|  | 
| Hold the screw while making adjustments.  A Grace G2 Gunsmith Screwdriver fits it great. | 
|  | 
| Use an open end ignition wrench and turn the nut to the right to lower the character or left to raise it.  An angled typewriter wrench would work a bit easier, but ignition wrenches work fine. | 
|  | 
| This is the adjustment.  I used 2 wrenches to free the jam nut, made the adjustment and rejammed the nuts.  I really did use 2 hands, but at the moment of the photo, one was holding the camera. | 
|  | 
| After the completed adjustments | 
|  | 
| This is the first typewriter added to the collection in 2014.  Do you know what make and model? | 
 | 
This started out as a short break from paper work to clean my HHE.  I was going to post on the HHE, but when I pulled my Underwood 4B I found I never replaced the ribbon I stole to install onto the SS.  I could have used the HHE, but decided to wait.
While searching Craigslist I found an offer too good to refuse.  One night after work I made a stop and the typewriter above found a new home.  A further hint is that it works fine.
I spent most of Saturday cleaning a few typewriters and then typing in the garage where I only have test paper and engineering paper.  I used the engineering paper and made many many typos.
I hope everyone is enjoying I.T.A.M.  Does not seem to be as much I.T.A.M. activity as a few years ago.  Each year seems to be a bit less.
Cameras?  Well the rain that is needed on the Left Coast is steadily falling for the past 2 weeks on the Right Coast.  Unless of course the coasts are observed from the North looking South.  No running, bicycling, or photography.  I think we had one day of sun.
Here is the original post on my HH.